Jannah Theme License is not validated, Go to the theme options page to validate the license, You need a single license for each domain name.
News

US Army eyes a heavier, hybrid-powered Infantry Squad Vehicle

The Army is planning to bulk up its lightweight Infantry Squad Vehicle with a heavier, hybrid-powered variant, according to a federal contracting notice.

The service wants to add 606 ISV-Heavy vehicles to its existing fleet of roughly 1,105 ISVs through a three-contract effort, signaling a shift in how it intends to use the platform.

While the original ISV was designed to rapidly move a nine-soldier squad across rugged terrain, the ISV-H is built to do more than just transport troops. Instead, it emphasizes onboard power generation and mission system support.

According to a GM Defense factsheet, the ISV-H is designed for ā€œa myriad of mission areas to include command and control, counter UAA, medical evacuation, loitering munition and drone deliver launch and recovery.ā€

The hybrid-electric design also enables ā€œsilent driveā€ and ā€œsilent watchā€ modes, allowing for ā€œstealthy ingress and egress for high threat zones, while powering equipment needed.ā€

The biggest change to the vehicle is its exportable power capability. In the solicitation, the Army said it wants the vehicle to generate and export 60 kW of continuous high-voltage DC power, 15 kW of 28V DC power and 4.8 kW of 120V AC power — effectively turning the ISV-H into a mobile energy source for small units in the field.

Despite its name, the ISV-Heavy is not an armored version of the original vehicle (though, it is ā€œadd-on armor capableā€). Instead, it is built on the commercial Chevrolet Silverado 3500 HD platform, with ā€œheavyā€ referring to its heavier-duty chassis rather than added protection.

That change comes with tradeoffs. The ISV-H weighs roughly 9,000 pounds more than the original and carries fewer troops. Early mockups show configurations ranging from two to six seats, compared to the nine-seat capacity of the baseline ISV.

The Army completed the first phase of the solicitation — collecting industry white papers — on April 13. Timelines for the remaining phases, including presentations and final proposals, have not been released.

Read the full article here

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button